NEC 2400 ipx Bedienungsanleitung Seite 334

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 428
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 333
CHAPTER 5 ND-71548 (E)
Page 316
Issue 2
INSTALLATION TEST PROCEDURE
NAP-200-025
Sheet 1/1
Station to Station Connection Test
START
Confirm that a connection can be established between Station A and Station B.
Station A goes off-hook.
Station A hears DT.
Station A dials the station number of Station B.
Station A confirms that DT stops when the first digit has been dialed.
Station A confirms that RBT (Ring Back Tone) is heard after dialing ends.
Station B hears ringing on the telephone set.
Station B lifts handset and answers the call.
After answering, both Stations A and B confirm that they can talk with each
other.
Stations A and B hang up. The connection is released.
END
LC
ORT
Station A
DT, ROT
LC
Station B
RG
*
*
*
*
*
Seitenansicht 333
1 2 ... 329 330 331 332 333 334 335 336 337 338 339 ... 427 428

Kommentare zu diesen Handbüchern

Keine Kommentare