NEC 2400 ipx Bedienungsanleitung Seite 331

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 428
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 330
ND-71548 (E) CHAPTER 5
Page 313
Issue 2
INSTALLATION TEST PROCEDURE
Figure 5-1 Example of Entry to Test Check Column
This example is NAP-200-023: DT Connection Test
When “*” is already printed in the “PROVIDED” section, the item concerned
is a basic function of the system. Test the item without exception.
When “PROVIDED” section is blank, the installer should enter “*”
mark as per the Job Specification.
The item with “*” must be tested without exception.
Check whether OPE lamp (G) is turning ON on RST circuit cards.
Check whether OPE lamp (G) is turning ON on LC circuit cards.
Lift handset.
Confirm DT (Dial Tone).
Check whether the Busy lamp (R) is turning ON for the
connected ORT and LC.
Keep listening to DT for about 12 seconds.
Confirm that DT changes to Reorder Tone (ROT).
Keep listening to ROT for about 30 seconds.
When System Data (SYS1,
INDEX 64, b
3
= 0, b
4
= 0)
are assigned.
Confirm that ROT changes to
“no tone.”
When System Data (SYS1,
INDEX 64, b
3
= 0, b
4
= 1 or
b
3
= 1, b
4
= 0) are assigned.
Confirm that howler tone is
heard after ROT stops.
(Analog Ports only)
Hang up and release the connection.
*
*
*
*
*
These are the
Test Check
Columns, the
left column is
“PROVIDE”
column and the
right columns is
the “CHECK”
columns.
STAR
T
END
Seitenansicht 330
1 2 ... 326 327 328 329 330 331 332 333 334 335 336 ... 427 428

Kommentare zu diesen Handbüchern

Keine Kommentare