NEC 2400 ipx Bedienungsanleitung Seite 350

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 428
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 349
CHAPTER 5 ND-71548 (E)
Page 332
Issue 2
INSTALLATION TEST PROCEDURE
NAP-200-030
Sheet 1/1
ATTCON (ATI Card) Connection Test
START
A station repeats an ATTCON
call. Each ATTCON answers
the call.
Station A dials the operator access code (normally, “0”).
At each ATTCON, the operator confirms that ATT lamp
flashes and the ringer sounds.
At each ATTCON, the operator answers the call by pressing
ATND key.
Station A confirms speech with each ATTCON.
The operator at each ATTCON releases by pressing CANCEL
key.
Station A goes on-hook.
Each ATTCON calls a station
by pressing LOOP keys one at a
time.
At each ATTCON, the operator dials the number of Station A
by using LOOP keys (L1-L6) one at a time.
Ringing at Station A is confirmed.
Station A answers the call and confirms speech.
The operator at the ATTCON releases by pressing CANCEL
key.
Station A goes on-hook.
END
ATI
DT, RBT
LCStation A
ATI
ATTCON
*
*
Seitenansicht 349
1 2 ... 345 346 347 348 349 350 351 352 353 354 355 ... 427 428

Kommentare zu diesen Handbüchern

Keine Kommentare