ND-71548 (E) CHAPTER 5
Page 315
Issue 2
INSTALLATION TEST PROCEDURE
NAP-200-024
Sheet 1/1
DT (Dial Tone) Connection Test
START
Check whether the OPE lamp (G) is turning ON on the RST circuit cards.
Check whether the OPE lamp (G) is turning ON on the LC circuit cards.
Lift handset.
Confirm DT (Dial Tone).
Check whether the Busy lamp (R) is turning ON for the connected ORT and LC.
Keep listening to DT for about 12 seconds.
Confirm that DT changes to Reorder Tone (ROT).
Keep listening to ROT for about 30 seconds.
When System Data (SYS1,
INDEX 64, b
3
= 0, b
4
= 0) are
assigned.
Confirm that ROT changes to “no tone”.
When System Data (SYS1,
INDEX 64, b
3
= 0, b
4
= 1 or
b
3
= 1, b
4
= 0) are assigned.
Confirm that howler tone is heard after ROT
stops. (Analog Ports only)
Hang up and release the connection.
END
LC ORTA
DT, ROT
*
*
*
*
*
Kommentare zu diesen Handbüchern