NEC 2400 ipx Bedienungsanleitung Seite 103

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 428
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 102
ND-71548 (E) CHAPTER 3
Page 85
Issue 2
INSTALLATION PROCEDURE
This NAP explains the following work items:
Extraction of Mounted Circuit Cards
Mounting of Circuit Cards
Setting of Switch Positions on Circuit Cards
Installation of CPR
1. PRECAUTIONS
1.1. Protection Against Static Electricity
When setting switches on circuit cards, use a Portable Field Service Grounding Kit in order to prevent damage
to static-sensitive components.
Example: 3M Model 8012, consists of:
•2 × 2 VELOSTAT
®
Work Mat
15 ft. (4.5 m) Ground Cord
CHARGE-GUARD
®
Wrist Strap with alligator clip
Before handling any circuit cards, first spread out the work mat, then connect the ground cord to the frame or
other ground source.
If a CHARGE-GUARD wrist strap is to be used, connect the wrist strap to the frame or other ground using the
provided cable.
1.2. Handling Circuit Cards
Whenever possible, do not handle circuit cards with bare hands.
The only portion of the card that can be touched is its edge. Do not touch the surface or the mounted components.
Doing so may damage the card.
Handle circuit cards carefully. Never bang or drop them.
1.3. Mounting or Removing Circuit Cards when the System Is in Operation
Never mount or remove a circuit card without first setting its MBR and/or MB switch to the UP position.
NAP-200-009
Sheet 1/13
Setting of Switch Positions and
Mounting of Circuit Cards
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required
Seitenansicht 102
1 2 ... 98 99 100 101 102 103 104 105 106 107 108 ... 427 428

Kommentare zu diesen Handbüchern

Keine Kommentare