ND-71548 (E) CHAPTER 5
Page 327
Issue 2
INSTALLATION TEST PROCEDURE
NAP-200-027
Sheet 2/2
System Initialization Test
Perform system initialization (by powering ON/OFF).
Initialization by powering
ON/OFF.
On all PWR Supplies, set the circuit breaker OFF
(Down). If a module contains two PWR Supplies,
they must be turned OFF.
Turn ON the PWR Supplies in each module in the
following order. If a module contains two PWR
Supplies, they must be turned ON.
Confirm When the system is initialized, the CPU OPE lamp
(Green) on the DSP turns ON.
When the system is initialized, System Message “7-
B” is displayed on the MAT.
Assignment of Date and Time After completing all the initialization tests, assign
data and time via MAT command “ATIM.”
END
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required
A
*
IMG0:
IMG1:
IMG2:
IMG3:
LPM
TSWM
PIM0
PIM0
PIM1
PIM1
PIM2
PIM2
PIM2
PIM2
PIM3
PIM3
PIM3
PIM3
PIM0
PIM0
PIM1
PIM1
Note: Be sure to turn OFF the power of LPM first.
Note: Be sure to turn OFF the power of LPM first.
LPM PIM0 PIM1 PIM2 PIM3
<Power OFF Procedure>
Single IMG Configuration
IMG1:
IMG3:
IMG2:
IMG1:
IMG0:
LPM PIM0 PIM1 PIM2 PIM3
TSWM0
PIM0
PIM0
PIM0
LPM
PIM2
PIM2
PIM2
PIM1
PIM1
PIM1
PIM1
PIM0
PIM3
PIM3
PIM3
PIM2 PIM3
<Power ON Procedure>
Single IMG Configuration
Multiple IMG Configuration
Seitenansicht 344