CHAPTER 5 ND-71548 (E)
Page 328
Issue 2
INSTALLATION TEST PROCEDURE
NAP-200-028
Sheet 1/1
Circuit Card Initialization Test
START
Make the No. 0 CPU the ACT system.
In each PIM, initialize any
Line/Trunk circuit card.
On the selected Line/Trunk circuit card, set MB switch UP.
The OPE lamp goes out.
System Message “7-K” is displayed.
Set MB switch DOWN.
OPE lamp turns ON.
System Message “7-L” is displayed.
Clear the alarm Clear the alarm indication by pressing ALM RST button on the
TOPU.
Make No. 1 CUP the ACT system.
In each PIM, initialize any
Line/Trunk circuit card.
On the selected Line/Trunk circuit card, set MB switch UP.
OPE lamp goes out.
System Message “7-K” is displayed.
Set MB switch DOWN.
OPE lamp turns ON.
System Message “7-L” is displayed.
Clear the alarm Clear the alarm indication by pressing ALM RST button on the
TOPU.
END
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required
*
Kommentare zu diesen Handbüchern