CHAPTER 5 ND-71548 (E)
Page 350
Issue 2
INSTALLATION TEST PROCEDURE
5. OVERALL TEST
5.1 Outline
Tests are to be performed to check C.O. Lines and/or Tie Lines by connecting them to a trunk on an individual
basis.
The speech path conditions (speech level, presence of noise, one-way speech, no speech, etc.) over the connec-
tion to the distant office will be checked. Release of the trunk used will also be checked.
5.2 Overall Test Procedure
The procedure for the Overall Test is described in the NAPs indicated to the right of each item in the following
flowchart.
START
Overall Test of C.O. Line Outgoing Call: NAP-200-043
Overall Test of C.O. Line Incoming Call: NAP-200-044
Overall Test of CCIS Tie Line Outgoing Call: NAP-200-045
Overall Test of CCIS Tie Line Incoming Call: NAP-200-046
Test of Connection Alternate Routing to All Tie Lines: NAP-200-047
Test of Tandem Connection to Tie Line: NAP-200-048
PAD Setting: NAP-200-049
END