NEC Express5800/R120b-2 Betriebsanweisung Seite 407

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 556
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 406
Upgrading Your Server 9-75
18. Attach the removed components.
19. Start up the SCSI BIOS utility, and then set up the SCSI device.
For details, see the instruction manual that came with your backup device.
20. Install the device driver for the connected backup device.
For details, see the instruction manual that came with your backup device.
Installing a USB interface device
1. Prepare as described on page 9-4.
2. Pull the server out of the rack (as described on page 9-4).
3. Remove the drive cover and logic cover (as described on page 9-25, 9-26).
4. Remove the PCI riser card (as described on page 9-51).
5. Remove the support bar and processor duct (as described on page 9-42).
6. Press the device carrier level to unlock the carrier, and then remove the carrier from the
front of the unit.
7. Press the tabs on both sides of the front panel.
Seitenansicht 406
1 2 ... 402 403 404 405 406 407 408 409 410 411 412 ... 555 556

Kommentare zu diesen Handbüchern

Keine Kommentare