NEC Express5800/R120b-2 Betriebsanweisung Seite 75

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 556
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 74
Setting Up Your Server 3-11
2. At least two persons are required to install the server. Securely hold the server and install
it in the rack.
Firmly fit the inner rails on the sides of the server into the rail assemblies that are installed
on the rack, and then slowly push the server into the rack.
3. If the server is locked on its way into the rack, slowly push it in while pressing the release
levers (blue) on the right and left sides of the server forward or rearward.
When the server is completely pushed into the rack, the server is locked.
Rail assembly
Inner rail at server side
Release lever (blue)
Seitenansicht 74
1 2 ... 70 71 72 73 74 75 76 77 78 79 80 ... 555 556

Kommentare zu diesen Handbüchern

Keine Kommentare