NEC SigmaBlade AD106a Betriebsanweisung Seite 41

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 162
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 40
Setting Up Your Storage and I/O Blade 3-7
Removal
1.
Power off the CPU blade to which the Storage and I/O Blade is being connected.
IMPORTANT:
Be very careful to power off the CPU blade that is connected with
the Storage and I/O Blade you are going to remove.
You cannot install or remove the Storage and I/O Blade while the
CPU blade is being powered on.
NOTE: The power of the Storage and I/O Blade is automatically
turned off linking with the CPU blade.
2. While pushing the eject button on the lower part of Storage and I/O Blade, pull the eject
lever toward you.
IMPORTANT: Be sure to push the eject lever in the Storage and I/O
Blade.
Seitenansicht 40
1 2 ... 36 37 38 39 40 41 42 43 44 45 46 ... 161 162

Kommentare zu diesen Handbüchern

Keine Kommentare