NEC Express5800/S120R-2 Betriebsanweisung Seite 52

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 126
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 51
5-18
Series3800/S120R-2 (6025B-3/6025B-3R) User's Manual
JLAN1/2 (Ethernet Ports)
Two Ethernet ports (designated JLAN1
and JLAN2) are located beside the
VGA port on the I/O backplane. These
ports accept RJ45 type cables.
Keylock
The keyboard lock connector is desig-
nated JK1. Utilizing this header allows
you to inhibit any actions made on the
keyboard, effectively "locking" it.
SGPIO
The two headers labeled SGPIO1
and SGPIO2 are for SGPIO (Se-
rial General Purpose Input/Output).
SGPIO provides a bus between the
SATA controller and the SAS drive
backplane to provide SAS enclosure
management functions. Connect the
appropriate cables from the back-
plane to the SGPIO1 and SGPIO2
headers to utilize SAS management
functions on your system.
Alarm Reset (JAR)
The system will notify you in the event
of a power supply failure. This feature
assumes that redundant power supply
units are installed in the chassis. Con-
nect a microswitch to the JAR header
to disable the power supply fail alarm.
Note: this header is unused on the
6025B-3, which has only a single power
supply module.
Alarm Reset
Pin De nitions (JAR)
Pin# De nition
2 +5V
1 Ground
SGPIO Header
Pin De nitions (SGPIO1, SGPIO2)
Pin# De nition Pin # De nition
1NC 2NC
3 Ground 4 Data
5 Load 6 Ground
7NC 8NC
Note: NC indicates no connection.
Seitenansicht 51
1 2 ... 47 48 49 50 51 52 53 54 55 56 57 ... 125 126

Kommentare zu diesen Handbüchern

Keine Kommentare