
Figures v
Figures
Figure 1-1. Rack-Mounted System Components 1-3
Figure 1-2. Pedestal System Components 1-4
Figure 2-1. EIA Square-Hole Pattern on the Vertical Rail 2-3
Figure 2-2. Numbering the Middle Hole of 4U 2-4
Figure 2-3. Screw Locations on the Rear Vertical Rails 2-5
Figure 2-4. Attaching the Mounting Brackets 2-6
Figure 2-5. Cage Nut Locations on Front Vertical Rails 2-7
Figure 2-6. Mounting the Shelf Unit on the Mounting Brackets 2-8
Figure 2-7. Securing the Shelf Unit to the Front Rails 2-9
Figure 2-8. Securing the Shelf Unit to the Mounting Brackets 2-10
Figure 2-9. Installing the Backplane Assembly on a Rack-Mounted
System 2-11
Figure 2-10. Installing the Modem Assembly on a Rack-Mounted
System 2-12
Figure 2-11. Installing the CPU-I/O Enclosures into a Cabinet 2-13
Figure 2-12. System in a Cabinet 2-14
Figure 3-1. Installing the Modem Assembly on a Pedestal System 3-2
Figure 3-2. Installing the CPU-I/O Enclosures into a Pedestal Case 3-3
Figure 3-3. CPU-I/O Enclosures Fully Inserted in a Pedestal Case 3-4
Figure 4-1. Ports on a Pedestal System 4-2
Figure 4-2. Ports on a Rack-Mountable System 4-3
Figure 4-3. Connecting a Rack-Mounted System Directly to AC Power 4-8
Figure 4-4. Connecting a Pedestal System Directly to AC Power 4-9
Figure 4-5. Connecting a Rack-Mounted System to a UPS 4-11
Figure 4-6. Connecting a Pedestal System to a UPS 4-12
Figure 4-7. Connecting the Systems to PDUs 4-14
Figure 5-1. PDU Components 5-2
Figure 5-2. Cage Nut Locations: PDU 5-3
Figure 5-3. Connecting a PDU to a UPS 5-4
Kommentare zu diesen Handbüchern